Ramban, Dec 09: The traffic movement inside Chenani-Nashri Tunnel, also known as Dr Syama Prasad Mookerjee Tunnel was on Friday suspended due to a power shutdown, officials said here.
An official told the news agency—Kashmir News Observer (KNO) that traffic will resume after power connectivity is restored inside the tunnel.
WhatsApp Group
Join Now
He said the reason behind power shutdown inside the tunnel was not known immediately.
Meanwhile, SP Ramban, Mohit Sharma in a Tweet said: “Traffic will resume after power connectivity restores. Inconvenience is regretted”.—(KNO)